Hoist
A wire-rope lifting unit that raises and lowers a load vertically.
Clear technical definitions for hoists, overhead cranes, duty class, capacity, span, brakes, limit switches, drives, wire rope and service terminology.
40 terms displayed
A wire-rope lifting unit that raises and lowers a load vertically.
A crane providing long travel on runways, cross travel on the bridge and vertical hook motion.
An overhead crane arrangement using one main bridge girder.
An overhead crane arrangement with a trolley travelling on two main girders.
A lifting system whose bridge transfers loads through legs to ground runways or wheeled supports.
A hybrid crane with one side on a building runway and the other on a gantry leg.
A local lifting system rotating through a defined arc or full circle on a column or wall.
A system in which the hoist travels along a single beam or runway.
The load-bearing assembly combining hook, sheaves, guards and connecting components.
A rotating grooved component on which wire rope is wound in a controlled pattern.
A guiding component that helps wire rope track correctly in drum grooves.
The load-bearing steel wire rope in a wire rope hoist, requiring the correct grade and dimensions.
The load-bearing rope in wire-rope systems, selected by construction and lay direction.
A wheel enabling bridge or trolley travel, with diameter and profile matched to the rail.
A mechanism converting motor speed and torque to levels suitable for hoisting or travel.
A safety component signalling the control circuit when motion reaches a defined limit.
A system monitoring load and restricting lifting when a defined threshold is exceeded.
A system controlling crane motions through a wireless transmitter and receiver.
A wired push-button station used to control hoisting and travel motions.
An electronic drive controlling motor speed, acceleration and deceleration.
An electrically operated switching device for motor and power circuits.
A brake assembly that holds or releases motion according to power and control conditions.
An enclosed conductor system supplying power along crane or trolley travel.
A cable-management system using trolleys along a track or profile for power and signals.
The maximum rated load the system is designed to lift under defined conditions.
The usable vertical distance between the lower and upper hook positions.
The design distance between the runway centre lines of a bridge or gantry crane.
The vertical space required between the structure and the hook at its highest position.
The minimum horizontal distance the hook can reach to a wall, structure or runway end.
A classification combining load spectrum, cycle count and operating duration.
A complete sequence of loading, lifting, travel, lowering and return.
Motion-induced effects added to static load by acceleration, braking, sway or impact.
Scheduled maintenance based on manufacturer instructions, use and environmental conditions.
A documented compliance inspection performed by authorised persons under applicable requirements.
Planned renewal of control, safety, electrical or mechanical components of an existing crane.
The post-installation process of adjustment, functional checks, testing and handover.
Service data including symptoms, error code, plate, photos, video, location and operating conditions.
A device used to command a safe stop of the control system in a hazardous situation.
A mechanical element limiting impact energy at runway ends or collision zones.
A sensing and control system helping maintain safe separation between equipment on the same runway.
Prepare capacity, span, lifting height, duty, site and power data with the calculators.