Understand hoist up/down, trolley and bridge commands, two-step pushbuttons, emergency stop, direction marking and commissioning checks.
How basic motions differ
Hoist up/down moves the load vertically. Trolley travel moves the hoist along the bridge, while bridge travel moves the complete bridge along the runway. Jib systems may also include slewing.
- Hoist
- Trolley
- Bridge
- Slewing
What two-step pushbuttons do
Depending on system configuration, first and second pushbutton stages can command different speeds or control behaviour. Button function is linked to the panel and drive design.
- First step
- Second step
- Speed
- Drive
When motion directions are checked
After installation, motor/panel work or changes to phase connections, command direction versus actual motion is part of commissioning verification.
- Command/direction match
- Installation
- Panel work
- Commissioning
Emergency stop and access
Emergency-stop function, control access and operator authorization belong in the site safe-work procedure. Control markings should remain readable and match actual equipment motion.
- Emergency stop
- Authorization
- Marking
- Safe operation
The quotation form organises load and site data into one WhatsApp message.
Request a Quote


Share your experience