Plan crane and hoist installation around site readiness, structure/runway, mechanical assembly, electrics, motion directions, brake/limit functions and handover.
Site readiness before installation
Supporting structure/runway, working level, installation access, power point, unloading area and site safety coordination are checked against project scope before installation starts.
- Structure/runway
- Access
- Power
- Unloading
Mechanical and electrical assembly
Bridge, trolley and hoist connections, runway/wheel relationship, electrification, panel, controls and cable routing follow the approved project information.
- Mechanical connections
- Runway/wheels
- Panel
- Cable routing
Commissioning checks
Motion directions, braking, limits, emergency stop, warnings and defined functional/load tests are recorded within the commissioning plan.
- Motion direction
- Brake
- Limits
- Functional/load test
Handover information
Equipment identification, maintenance information, critical-part references, completed checks and the service contact route should remain accessible to the user.
- Equipment data
- Maintenance
- Check records
- Service route