Plan crane and hoist installation around site readiness, structure/runway, mechanical assembly, electrics, motion directions, brake/limit functions and handover.

Site readiness before installation

Supporting structure/runway, working level, installation access, power point, unloading area and site safety coordination are checked against project scope before installation starts.

  • Structure/runway
  • Access
  • Power
  • Unloading

Mechanical and electrical assembly

Bridge, trolley and hoist connections, runway/wheel relationship, electrification, panel, controls and cable routing follow the approved project information.

  • Mechanical connections
  • Runway/wheels
  • Panel
  • Cable routing

Commissioning checks

Motion directions, braking, limits, emergency stop, warnings and defined functional/load tests are recorded within the commissioning plan.

  • Motion direction
  • Brake
  • Limits
  • Functional/load test

Handover information

Equipment identification, maintenance information, critical-part references, completed checks and the service contact route should remain accessible to the user.

  • Equipment data
  • Maintenance
  • Check records
  • Service route