Plan commissioning after installation or modernization around functions, motions, limits, brakes, controls and project requirements.

What is the commissioning sequence?

After mechanical installation, electrical connections and safety functions are complete, no-load motions, directions, limits, brake behaviour and control functions are checked. The following test scope is defined by the project and applicable requirements.

  • Mechanical installation
  • Electrical and controls
  • No-load functions
  • Brakes and limits

What does a load-test plan need?

Test load, method, site safety plan, measurement method and records should be prepared for the equipment class and applicable requirements. A defined controlled test replaces improvised loading.

  • Defined test load
  • Controlled test area
  • Measurement and records
  • Applicable requirements