Prioritise brakes, contactors, limits, controls, wheels, bearings, rope/chain and drive parts by failure impact, lead time and replacement difficulty rather than price alone.

What makes a spare part critical?

Criticality is not the same as price. Consider whether its failure stops production, whether a temporary alternative exists, lead time and the access needed for replacement.

  • Production impact
  • Lead time
  • Alternative availability
  • Replacement access

Separate fast-moving from long-lead items

Contactors, fuses, buttons or some limit devices may be fast-moving, while special brakes, wheels, gearboxes, motors or rope components may have longer lead times. Keep inventory by equipment make, model and technical dimensions.

  • Fast-moving group
  • Long-lead group
  • Make/model matching
  • Dimensions and part number

How is stock level defined?

Number of identical assets, annual fault/replacement history, shifts and planned shutdown windows influence stock level. Common parts across multiple cranes can be consolidated into a central critical-spares list.

  • Asset count
  • Failure history
  • Shift intensity
  • Planned shutdowns

How to reduce ordering errors

Keep nameplates, part numbers, shaft/hole dimensions, electrical ratings, connection type and clear photographs in one technical record before ordering. The same record reduces identification time during breakdowns.

  • Nameplate and part number
  • Measured photos
  • Electrical ratings
  • Connection type
Send technical data in a structured form.