No universal calendar
Intervals depend on use intensity, environment, load spectrum and equipment history, not the calendar alone.
Inspection records
Brakes, limits, hooks, wire rope, drums, wheels, runway, fasteners, panels and controls should be documented.
Critical spares
Build compatibility lists for production-critical contactors, controls, brake components, limits and power-supply parts.
Competence
Inspection and maintenance must follow applicable law, manufacturer instructions and authorised-person requirements.
Technical verification is required.
This is general technical information. Project, capacity, safety and compliance decisions require site data and authorised engineering verification.