Why net load is not enough
The workpiece weight is not the entire lifting load. Beams, magnets, grabs, slings and below-the-hook devices add to the gross load.
Centre of gravity and geometry
Long, flexible, liquid-filled or unbalanced loads may require special attachments, dual-point lifting or synchronised motion.
Operating intensity
A crane used a few times per day is not equivalent to one serving multi-shift production. Cycles, load spectrum and annual use must be reviewed together.
Final decision
Pre-check tools prepare data. Capacity, structure, duty class and safety components require engineering verification.
Technical verification is required.
This is general technical information. Project, capacity, safety and compliance decisions require site data and authorised engineering verification.