Structural independence
Gantry legs can transfer crane loads to an independent or semi-independent runway.
Outdoor conditions
Wind, rain, temperature, corrosion, parking position and power feed are project inputs.
Cantilever area
End cantilevers may extend handling beyond the runway footprint.
Infrastructure
Rails, foundations, drainage, buffers and collision zones require site engineering.
Technical verification is required.
This is general technical information. Project, capacity, safety and compliance decisions require site data and authorised engineering verification.



Share your experience