What does the system in the video demonstrate?
These real field recordings show an electric hoist, hook line and material/load platform in a façade-side monorail lifting arrangement. Customer, location, capacity or structural adequacy are not inferred from imagery. A similar application is planned around runway/support geometry, load, vertical/horizontal travel, façade opening, outdoor conditions, operator visibility and the controlled area below.


Share your experience